Old 08-30-2018, 01:18 PM
foundit66's Avatar
Moderator
 
Join Date: Oct 2007
Location: California
Gender: Male
Posts: 25,485
Thanks: 10,065
Thanked 15,213 Times in 9,221 Posts
Post Marines 3D-print concrete barracks in just 40 hours

Quote:
Marines have used a specialized 3D concrete printer to print a 500-square-foot barracks room in just 40 hours.

The innovative project created the world’s first continuous 3D-printed concrete barracks, according to the Marine Corps.

The barracks room was built earlier this month at the U.S. Army Engineer Research and Development Center in Champaign, Ill. Army and Navy Seabees were also involved in the construction effort.

Harnessing the world’s largest concrete printer, the Additive Manufacturing Team at Marine Corps Systems Command teamed up with Marines from I Marine Expeditionary Force.

“This exercise had never been done before,” said Capt. Matthew Friedell, Additive Manufacturing project officer in MCSC’s Operations and Programs/G-3, in a statement. “People have printed buildings and large structures, but they haven’t done it onsite and all at once. This is the first-in-the-world, onsite continuous concrete print.”

Using Computer Aided Design software on a 10-year-old computer, the concrete was pushed through a print head and layered repeatedly to build the barracks room walls. Friedell said that the job took 40 hours because Marines were carefully monitoring the project and continually filling the printer with concrete. However, if a robot was used to do the mixing and pumping, the building could be built in 24 hours, he added.
Marines 3D-print concrete barracks in just 40 hours | Fox News

I can just picture an older Marine replying to this with a "back in my day..."
Normally, it takes 10 Marines five days to construct a barracks hut out of wood.
__________________
“Labor is prior to, and independent of, capital. Capital is only the fruit of labor, and could never have existed if labor had not first existed. Labor is the superior of capital, and deserves much the higher consideration.”
~Abraham Lincoln
Reply With Quote
The Following 3 Users Say Thank You to foundit66 For This Useful Post:
  #2 (permalink)  
Old 08-30-2018, 11:08 PM
cnredd's Avatar
Administrator
 
Join Date: Oct 2007
Location: Philadelphia
Gender: Male
Posts: 53,291
Thanks: 2,074
Thanked 32,997 Times in 19,196 Posts
Default Re: Marines 3D-print concrete barracks in just 40 hours

Quote:
Originally Posted by foundit66 View Post
I can just picture an older Marine replying to this with a "back in my day..."
Normally, it takes 10 Marines five days to construct a barracks hut out of wood.
And they had to move the wood uphill both ways...

The story is impressive, but I don't know how much of a NEED for this...and I hope this was a lowcost exercise instead of a million-dollar waste...
__________________
"You get the respect that you give" - cnredd
Reply With Quote
The Following 3 Users Say Thank You to cnredd For This Useful Post:
  #3 (permalink)  
Old 08-31-2018, 07:40 PM
saltwn's Avatar
PW Enlightenment
 
Join Date: Oct 2007
Location: Esto perpetua
Posts: 77,077
Thanks: 54,268
Thanked 25,778 Times in 18,364 Posts
Send a message via Yahoo to saltwn
Default Re: Marines 3D-print concrete barracks in just 40 hours

Quote:
Originally Posted by foundit66 View Post
Marines 3D-print concrete barracks in just 40 hours | Fox News

I can just picture an older Marine replying to this with a "back in my day..."
Normally, it takes 10 Marines five days to construct a barracks hut out of wood.
it would have taken a private company 80 hours due to cost plus
__________________
Mueller is good at witch hunting. Its raining witches. America is GREAT.

Doreen E
Reply With Quote
  #4 (permalink)  
Old 09-10-2018, 02:48 PM
jamesrage's Avatar
Scholar
 
Join Date: Jan 2008
Location: A place where common sense still exist.
Gender: Male
Posts: 2,013
Thanks: 950
Thanked 1,152 Times in 729 Posts
Default Re: Marines 3D-print concrete barracks in just 40 hours

I wonder how long it took to set all that up so that the 3d printer can do that?
__________________
"There can be no divided allegiance here. Any man who says he is an American, but something else also, isn’t an American at all. We have room for but one flag, the American flag… We have room for but one language here, and that is the English language… and we have room for but one sole loyalty and that is a loyalty to the American people.”—Theodore Roosevelt
Reply With Quote
  #5 (permalink)  
Old 09-11-2018, 06:46 PM
Bat Bat is offline
Hinged
 
Join Date: Jan 2016
Posts: 1,629
Thanks: 70
Thanked 1,071 Times in 645 Posts
Default Re: Marines 3D-print concrete barracks in just 40 hours

Quote:
Originally Posted by foundit66 View Post
Marines 3D-print concrete barracks in just 40 hours | Fox News

I can just picture an older Marine replying to this with a "back in my day..."
Normally, it takes 10 Marines five days to construct a barracks hut out of wood.
I'm not a Marine, I'm a dogface. We could put up the tent in about 15 minutes and dig a safe fox hole in about an hour. I think I'd prefer the concrete barracks. Maybe do my first two days in the tent, then upgrade to the solid walls and more room.
Reply With Quote
Reply

Tags
3dprint, barracks, concrete, hours, just, marines

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On

Forum Jump


All times are GMT -5. The time now is 10:37 AM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2018, vBulletin Solutions, Inc.

Content Relevant URLs by vBSEO 3.2.0